Today we completed a cable control project in Yunnan. This is a project we cooperated with the local telecommunications company to control the cable monitoring for the community of Tami Road, Guandu District, Kunming City, Yunnan Province. Now we will show you our construction process and completion status.
![]() |
![]() |
We took into account the local environment, temperature, and humidity. We conducted a site survey and line planning. Of course, before doing this, we obtained local installation permits.We confirmed the underground facilities and the type of optical cable (overhead, underground, direct buried).
Next is material preparation, selecting the appropriate optical fiber cable (single mode/multimode) collection duct, traction equipment and joint box, preparing cable reels and transporting them to the site, and verifying whether the test equipment is available (OTDR, power meter).
We must always pay attention to key safety precautions during construction:
1 Always wear personal protective equipment (hard hat, goggles, gloves)
2 Use appropriate ladder safety devices when working at heights
3 Implement traffic control at road intersections
4 Follow laser safety regulations during testing
Finally, we completed the construction and conducted project inspections. After everything met the requirements, our project was perfectly implemented.
![]() |
![]() |